How a project flies

Process

How a project moves through Apogee, from the first audit to the system your team runs without us.

We borrowed the shape of this page from a mission profile because it is the most honest way we know to describe the work: a project moves through distinct, named phases, each with a clear exit condition, and nobody moves to the next phase until the current one is done.

  1. Pre-flight. Two weeks of audit and interviews before a single pixel moves. We read your existing materials, sit in on two engineering meetings, and talk to whoever answers your support inbox. We leave with a written brief you sign off on.
  2. Trajectory. A short concepting phase — usually one week — where we test two or three directions against the brief, not against our own taste. You see rough work early and often; nothing arrives as a surprise reveal.
  3. Burn. The system gets built, in the open, in weekly working sessions. This is the longest phase and the one where most of the real decisions get made: type scale, component anatomy, documentation structure.
  4. MECO. Main engine cutoff — the point where the core system is feature-complete and we shift from building to refining. We run the guideline against real content from your team, not placeholder copy.
  5. Separation. We hand off source files, a written guideline, and office hours for your team to ask questions without us in the room. Nothing ships in a format only we can open.
  6. Telemetry. A check-in at thirty and ninety days after handoff. Systems drift once real teams start using them; we would rather hear about it early than find out a year later that nobody followed the guide.

Most engagements run twelve to eighteen weeks end to end, depending on how much of the pre-flight audit is already done when we arrive. If that timeline works for you, start a project, or read the services each phase typically covers.